Key Projects 2019 << Back

S.No Project Tender No From To Client
1 Design, Build, Own And Operate And Transfer (Boot) Of 1000 Cum Capacity Water Production In Duqm. CUC-WSP-00-000-PM-SOW-0001 22/09/2019 30/12/2019 MARAFIQ
2 Upgrading Of Sur Al Hadid (P116) Primary Substation From 2X20Mva To 3X20Mva 06/2019 28/07/2019 25/05/2020 MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C.
3 Operation & Maintenance Of Desalination Plants In Muscat Governorate. 23/2019 17/07/2019 23/02/2020 PUBLIC AUTHORITY FOR WATER
4 Build, Own And Operate A Water Desalination Plant With Reverse Osmosis Technology (40,000 Cu.M/Day) At Wadi Al-Ain Wellfield For Five Years 01/2018 14/05/2019 13/09/2024 PUBLIC AUTHORITY FOR WATER
5 Design, Build, Own And Operate And Transfer (Boot) Of 2000 Cum Capacity Water Storage Tank In Duqm. CUC-WSP-00-000-LE-TND-0002 30/04/2019 10/11/2019 MARAFIQ
6 Operation And Maintenance Of Rural Power Station At Group A, Mussandam Reigon RAEC-31/2018 01/03/2019 28/02/2023 TANWEER
7 Operation And Maintenance Of Rural Power Station At Group C, Al Wusta Reigon For Masrooq Power Station RAEC-12/2018 01/03/2019 31/07/2022 TANWEER
8 Dismantle, Transfer, Operation And Maintenance Of Ro-Desalination Plants In Muscat Governorate 23/2019 09/01/2019 31/08/2024 PUBLIC AUTHORITY FOR WATER
9 Operation and Maintenance of Rural Power Station at Group E, Dhofar Reigon RAEC-14/2018 01/01/2019 31/12/2023 TANWEER
10 Proposal 33 KV,11 KV, OHL Work &Construction Of New 1x10 MVA Transformer Work At Al-Saffa Primary Sub Station For Expansion Work Of Poultary Farm Package 2 At Tumrait 02/2018 01/01/2019 29/07/2019 Al-Saffa Foods (SAOG)
11 EPC for Electrical Power Supply to Light Medium Industrial Zone for Duqm in Wusta Governorate 25/2018 06/01/2019 05/07/2020 TANWEER
12 Operation and Maintenance of Al Duqum Desalination Plant At Al Wusta Governorate RAEC-18/2018 14/08/2019 24/08/2019 TANWEER

Clients